Operation – Beisler 1360-4 User Manual

Page 36

Advertising
background image

Operating Instructions Automatic Multi-Head Serging Machine 1365-4

Beisler GmbH

B-26

B.3

Operation

B.3.8 Securing the sewing pieces

The trousers panels are prepared at the upper shelf, the knee lining is pre-

pared at the lower shelf.

Bonding the trousers panels:

1. Make sure that the bonding sta-

tion heating module has reached

its operating temperature; the red

indicator 6 must be off.

1. Fig. 23: Line up knee lining 1

below the bonding clamp 2.

2. Press clamp switch 3; the

clamp lowers and secures the

knee lining. Simultaneously, a fi-

xed section of the bonding mesh

5 is advanced and removed

from the backing tape at the se-

parator.

3. Place trousers panel onto lining

and align properly. To change the

position of the knee lining, press

the clamp switch to open the

bonding clamp.

4. If the sewing pieces are aligned

properly on top of each other,

press the bonding switch 4.

The upper stamp is lowered,

presses knee lining, bonding

mesh, and trousers panel against the heated lower stamp and is then

raised.

5. The bonding clamp opens.

6. The trousers panels are now securely attached to each other and can

be lined up for the serging process at the A machine.

Fig. 23

Advertising
This manual is related to the following products: