Read nfpa 30a and nfpa 70, Preparing for installation, Warning – Gasboy Atlas Fuel Systems Installation Manual User Manual
Page 34: Caution

Installation
Read NFPA 30A and NFPA 70
Page 6-4 MDE-4331M Atlas® Fuel Systems Installation Manual · September 2014
Read NFPA 30A and NFPA 70
DEF is not flammable or explosive. Therefore, installation requirements for DEF units differ
from units that handle hazardous fuels. However, electrical safety requirements are applicable.
When installing a DEF unit in a hazard zone defined by the location of another
pump/dispenser handling hazardous fuels, the area of the DEF dispenser within the hazard
zone must conform to requirements for units handling hazardous fuels.
You are working in a dangerous environment of gasoline, gasoline vapor, and electricity.
Failure to install this equipment in accordance with NFPA 30A and NFPA 70 can result in
severe injury or death. Read, understand, and follow NFPA 30A and NFPA 70.
WARNING
Before installing the equipment, read, understand, and follow:
• The NEC (NFPA 70)
• The Automotive and Marine Service Code (NFPA 30A)
• Any national, state, and local codes that may apply
Failure to install the equipment as per the NFPA 30A and NFPA 70 may adversely affect
the safe use and operation of the system.
CAUTION
Accurate, sound installations reduce service calls. Use experienced, licensed contractors that
practice accurate, safe installation techniques. Careful installation can eliminate potential
problems.
The equipment manufacturer must provide instructions for other equipment such as STPs,
shear valves, and underground tanks. Complete installation instructions for other
manufacturer’s equipment are not provided.
Preparing for Installation
To prepare for the installation, proceed as follows:
1
Read all instructions before beginning the installation.
2
Follow all safety precautions:
• Barricade the area.
• Do not allow vehicles or unauthorized people in the work area.
• Do not smoke or allow open flames in the work area.
• Do not use power tools in the work area.
• Wear eye protection during the installation.
• Use circuit breakers to turn off all power to pumps/dispensers and STPs. Multiple
disconnects may be required.