Start-up - blower – Greenheck DG / DGX with Pilot Ignition (463555 IOM) (Pre-2008) User Manual

Page 19

Advertising
background image

19

Start-Up - Blower

Start-Up

Voltage, Hertz,

and Phase

Step 1 Check the Voltage

Before starting the unit, compare the supplied voltage, hertz, and phase with the unit and motor’s nameplate
information.

Step 2 Check the Blower Rotation

Open the blower access door and run the blower momentarily to determine the rotation. Arrows are placed on
the blower scroll to indicate the proper direction or reference the example below.

IMPORTANT!

If the blower is rotating in

the wrong direction, the

unit will move some air,

but will not perform as

designed. Be sure to

perform a visual inspection

to guarantee the correct

blower rotation.

Blower

Rotation

Housing

SPECIAL EQUIPMENT REQUIRED

Below is a list of special tools that are required. A recommended model is shown, but equivalent
products may be used.

Description

Manufacturer-Model

Phone

Website

Voltage Meter

Fluke-179

1-800-44-FLUKE

www.fluke.com

Amperage Meter

Fluke-179

1-800-44-FLUKE

www.fluke.com

Thermometer

Fluke-50

1-800-44-FLUKE

www.fluke.com

Micro Amp Meter

Fluke-16

1-800-44-FLUKE

www.fluke.com

U-Tube manometer

Dwyer-Slack Tube

1-219-897-8000

www.dwyer-inst.com

Tachometer

Monarch-Pocket Tach 100

1-800-999-3390

www.monarchinstruments.com

WARNING!

Disconnect and lock-out all power and gas before

performing any maintenance or service to the

unit. Failure to due so could result in serious

injury or death and damage to equipment.

Pre Start-Up Check

Rotate the fan wheel by hand and make sure no parts
are rubbing. Check the V-belt drive for proper
alignment and tension (a guide for proper belt tension
and alignment is provided in the belt maintenance
section). Check fasteners, set screws and locking
collars on the fan, bearings, drive, motor base and
accessories for tightness.

NOTE!

To reverse the rotation on three phase

units, disconnect and lock-out the power,

then interchange any two power leads.

NOTE!

To reverse the rotation on single phase

units, disconnect and lock-out the power,

then rewire the motor per the

manufacturer’s instructions.

REFER TO THE START-UP CHECKLIST IN THE REFERENCE SECTION

BEFORE PROCEEDING FURTHER!

Blower Rotation

WARNING!

Check the housing, blower, and ductwork for any foreign objects before running the blower.

Electrical Nameplate

SUP HP

MCA

EXH HP

MOP

VOLTS

HZ

PH

Advertising