Reference – Greenheck DG / DGX with Pilot Ignition (463555 IOM) (Pre-2008) User Manual

Page 48

Advertising
background image

48

Reference

Reference

Unit Model Number

____________________________ (e.g. DGX-120-H32-DB)

Unit Serial Number

____________________________ (e.g. 04C99999 or 10111000)

Start-up date

____________________________ (MM/DD/YYYY)

Start-up Personnel Name

____________________________

Start-up Company

____________________________

Phone Number

____________________________

Pre Start-Up Checklist -

check boxes as items are completed

†

Check tightness of all factory wiring connections

†

Verify control wiring wire gauge

†

Hand-rotate blower to verify free rotation

†

Verify supply voltage to the main disconnect

†

Verify the supply gas pressure

†

Verify remote controls wiring

Start-Up Blower Checklist - refer to IOM for further detail

†

Check line voltage

L1-L2

________________

L2-L3 ______________

L1-L3 ________________

†

Check blower rotation

†

Check for vibration.

†

Supply fan RPM

______________

RPM

†

Motor nameplate amps

______________

Amps

†

Actual motor amps

______________

Amps

†

Actual CFM delivered

______________

CFM

Optional Accessories -

refer to IOM for further detail

Optional component

Actual Setting

Typical Setting

†

Heating inlet air sensor

______________

60-70º F

†

Cooling inlet air sensor

______________

75º F

†

Building freeze protection

______________

5 minutes; 45º F

†

Dirty filter gauge

______________

varies

†

Solid fuel time delay

______________

varies

Start-Up Direct Gas -

refer to IOM for further detail

†

Check supply gas pressure ____________Maximum

__________ Minimum

__________Actual

†

Set optional High gas pressure switch

______________

Actual

(Typical 8 in. wc.)

†

Set optional Low gas pressure switch

______________

Actual

(Typical 3 in. wc.)

†

Set burner pressure differential

______________

Actual

(Typical 0.65 in. wc.)

†

Set the maximum firing rate

______________

temp rise

†

Set the minimum firing rate

______________

check

†

Set the unit’s operating temperature

______________

degrees F

Start-Up Checklist

Advertising