Step 6 Adjust the Water Bleed-Off Rate

The water bleed-off rate is dependent on the water’s mineral content. The bleed-off should be adjusted based
on media’s mineral deposits after two weeks of service. See the picture below for location of bleed-off valve.

Step 8 Put the Unit into Service

Remove the jumper, and energize the blower(s). Verify proper operation.

Start-Up - Evaporative Cooling Recirculating (Optional)

Step 1 Check the Installation

The media may have been removed during installation, so its
orientation should be double checked. The media should be
installed with the steeper flute angle sloping down toward the
entering air side. See the figure on the right.

Verify that the stainless steel caps and distribution headers
are in place. The headers should be located over the media
towards the entering air side. The caps should be placed over
the headers.

Leaving Air

Entering Air

45°

15°

Step 2 Check the Pump Filter

Check that the pump filter is around the pump inlet. See the picture below.

Step 3 Fill the Sump and Adjust the Float

Turn on the water supply and allow the pan to fill. Adjust the float valve to shut-off the water supply when the
sump is filled to within 1 in. of the bottom of the overflow. See the picture below.

Step 5 Check the Flow Rate

The pumps should provide enough water to saturate the media in 45 to 60 seconds. Consult the factory, if
adequate flow is not achieved.

Bleed-Off

Valve

Overflow

Pump

Filter

Threaded Float

Adjustment

Supply

Connection

Float

Valve

Step 7 Set the Optional Auto Drain and Fill

Set the auto drain and fill timer and temperature settings. Timer settings are t1: 1.0, 10min and t2: 0.4, 60h
Temperature is typically set to 45ºF. See the pictures below.

IMPORTANT!

Check the media for minerals after two weeks of service and adjust the bleed-off rate accordingly.

NOTE!

A jumper will need to be installed in the control

center to power the evaporative pumps with the

blower(s) off. Reference the unit’s ladder

diagram to determine proper terminals.

Evaporative

Timer

t2 settings

t1 settings

Evaporative Freeze

Protection

Temperature

Setting

Step 4 Break-in the Media

Open the bleed-off valve completely and saturate the
media with the blower(s) off for no less than 20
minutes.