16  Multicluster Operation

SMA America, LLC

142

SI4548-6048-US-BE-en-20

Operating Manual

16 Multicluster Operation

16.1 Communication between the Sunny Island Inverters

For increased output, up to four Sunny Island clusters can be interconnected to form a Multicluster
system. A Multicluster Box for Sunny Island 4548-US / 5048-US / 6048-US (MCB-12U) is required
for such systems. Within each cluster, a communication interface connects the master to the slaves.
Each cluster is connected to the others via another communication interface connected to the
respective master.
The Multicluster Piggy-Back (MC-PB) is plugged into the Sunny Island at the external communication
slot. The scope of delivery of the Multicluster Piggy-Back includes a grounding cable. Lay the
grounding cable (B) as illustrated in the following figure:

Position

Description

A

Multicluster Piggy-Back (MC-PB)

B

Grounding cable connection

C

Cable route

Electrostatic Discharge
Electrostatic discharges are an acute danger to the Sunny Island and to the communication
interface.

• Ground yourself before removing the communication interface from the packaging, and

before touching any components within the Sunny Island. To achieve this, touch PE.