4 charge controller (140#)(not ul-certified) – SMA SI 4548-US User Manual

Page 164

Advertising
background image

19  Parameter Lists

SMA America, LLC

164

SI4548-6048-US-BE-en-20

Operating Manual

19.1.4 Charge Controller (140#)(not UL-certified)

141# SIC50 Total

142# SIC50 1

03

ChpRmgTm

Remaining time of the
CHP plant (minimum
run time) in hours,
minutes and seconds

04

ChpStrRmgTm

Remaining time of the
power request of the
CHP plant in hours,
minutes and seconds

Visibility of parameters in menu 140#
The parameters in menu 140# are only visible, if at least one Sunny Island Charger is
connected to the system.

No. Name

Description

01

TotSicEgyCntIn

Total energy of all Sunny Island Chargers in kWh

02

TotSicDyEgyCntI
n

Total daily yield of all Sunny Island Chargers in kWh

03

TotSicPvPwr

Total PV power of all Sunny Island Chargers in W

04

TotSicBatCur

Total battery current of all Sunny Island Chargers in A

No. Name

Description

01

Sic1EgyCntIn

Energy of the first Sunny Island Charger in kWh

02

Sic1TdyEgyCntI
n

Daily yield of the first Sunny Island Charger in kWh

03

Sic1PvPwr

PV power of the first Sunny Island Charger in W

04

Sic1PvVtg

PV voltage of the first Sunny Island Charger in V

05

Sic1BatVtg

Battery voltage of the first Sunny Island Charger in V

06

Sic1BatCur

Battery current of the first Sunny Island Charger in A

07

Sic1HsTmp

Heat sink temperature of the first Sunny Island Charger in °C

08

Sic1SWVers

Software version of the first Sunny Island Charger

No. Name

Description

Value

Explanation

Advertising
This manual is related to the following products: