HP 2/8q Fibre Channel User Manual

Page 103

Advertising
background image

Switch Manager

103

HP StorageWorks 2/8q Fibre Channel Switch Management User Guide

One of the selected ports is currently in use as

a donor port to allow for extended credits on

another port. Modifications to donor ports are

not permitted.

Deselect the donor ports, and then retry the

operation.

Port reset failed.

or

Request to reset to factory defaults has failed.

or

Request for switch reset failed.

Verify that the user has permissions to modify

the configuration on the switch, that the switch

is reachable in the fabric, and that the fabric is

reachable from the user’s workstation, and

then retry the configuration change.

Request for switch reset failed because admin

access was not available.

Verify that another user is not currently

modifying the switch configuration, using

either the management application, or a telnet

login, or any application, and then retry the

operation.

Reset will complete shortly. There is a brief loss

of connectivity with switch.

Wait for the switch to become reachable

again. This may take up to one minute.

Resetting the switch will disrupt traffic. Do you

wish to continue?

or

Deactivating the active zone set will disrupt

traffic. Do you wish to continue?

The requested action causes the servers and

storage systems attached to the fabric to lose

communications until the switch reset is

complete and the fabric has re-initialized. If

this is acceptable, continue; otherwise cancel

the operation.

Resetting to factory defaults will disrupt traffic

and cause current switch configuration to be

lost.

This action is disruptive to the fabric. Verify

that this is the action that you want to take.

Showing Last Known State.

The switch state displayed by the application

cannot be updated because the switch has

become unreachable. Verify that the switch is

reachable in the fabric, and that the fabric is

reachable from the user’s workstation.

The file currently exists.

The selected switch archive file already exists.

If it is acceptable to overwrite the file, continue.

Otherwise, return and select a different

archive file.

The online port loopback test can only be

performed on a single port at a time. There

are multiple ports selected. Continue with

loopback test on first selected port.

Select only a single port, and then retry the

operation.

The zoning information you are about to edit

is incomplete. If you apply changes you will

possibly lose zoning information.

The application has not been able to

completely read the current zoning database

from the switch. If the user edits the incomplete

database information and applies the

changes, any information which has not been

read from the switch is lost.
If this is acceptable, continue. Otherwise,

verify that the switch is reachable in the fabric,

and that the fabric is reachable from the user’s

workstation then refresh the display and verify

that the zoning database has been completely

read, and then retry the operation.

Unable to perform request. Switch is currently

unreachable.

Verify that the switch is reachable in the

fabric, and that the fabric is reachable from

the user’s workstation, and then retry the

operation.

Table 33: Faceplate display messages (Continued)

Message

User action

Advertising
This manual is related to the following products: