McCulloch RE155107RB User Manual

Page 25

Advertising
background image

25

To Assemble Bagger

• Unfold bag by pivoting front bagger tube all the way

forward and pressing the bottom vinyl binding onto the

tube.

• Inside the bag, install spreader bars and retainer springs

onto pins on both sides of bag as shown.

• Press the vinyl bindings onto the sides of front bagger

tube.

• Slide the bagger dump handle through the hole in the

bagger top, install the clevis pin 10 x 44mm and secure

with retainer spring.

• Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order

to use the handle to clear the chute in the event it has become

clogged.

Bagger adjustment

For proper bag function and appearance, it may be nec-

es sary to adjust the bagger assembly. There should be 6mm

(1/4")-9mm (3/8") gap between the bagger top and fender and

the bagger top surface should be even with the top surface

of the fender. To adjust bagger position:

Horizontal adjustment

• Slightly loosen the nuts securing the bagger RH and LH

hor i zon tal adjustment brackets. Loosen only enough so

the brackets keep their position, but allow them to be

moved.

• Move the brackets the amount forward or back ward you

wish the bag assembly to move. Retighten the nuts

securely.

Vertical adjustment

• Slightly loosen the nuts securing the vertical adjustment

brackets. Loosen only enough so the brackets keep their

position, but allow them to be moved.

• Move the brackets the amount up or down you wish the

bag assembly to move. Retighten the nuts securely.

• Reinstall the bagger as sem bly and check the bagger to

fender fit. If necessary, repeat the procedure until proper

fit is attained.

• After proper fit is attained, remove bagger from tractor

and install bagger latch (4) to tractor back plate as shown.

Tighten securely.

• Install and carefully lower bagger to actuate latch.
• Measure distance between bagger and latch as shown.

If distance is not 10mm - 16mm carefully remove bagger

and repeat vertical adjustment as needed.

1. Front bagger tube
2. Vinyl

binding

3. Spreader

bars

4. Retainer

spring

5. Vinyl

binding

1. Top Surfaces Even
2. Horizontal Adjustment Brack et
3. Vertical Adjustment Brack et
4. Bagger

Latch

02

90

5

2

1

02

90

6

4

3

4

5

5

6. Dump handle tube
7. Clevis pin 10 x 44mm
8. Retainer

spring

9. Cap

029

07

6

7

8

9

02967

1

6MM (1/4") - 9MM (3/8")

2

3

4

To convert to bagging, mulching or discharge

See "Sec tion 5" of this manual.

0298

3

10MM (7/16") - 16MM (5/8")

4

2

Advertising
This manual is related to the following products: