Tools required, Install stabilizer, Tools required -28 install stabilizer -28 – StorageTek 9840 User Manual

Page 78

Advertising
background image

Rack

3-28

Sixth Edition

95741

CAUTION:

Equipment damage. Do not attempt to move the rack once drive or CSL
trays are installed. To prevent damage to the rack, you must remove all
drive/CSL trays and the stabilizer before relocating the rack.

Tools Required

The following tools are required to complete this installation:

1/2 in. open-end wrench

3/4 in. open-end wrench

Assorted Torx screwdrivers

Bubble level

Install Stabilizer

Use the instructions below to install the stabilizer plate on the rack:

1. Use a 3/4 in. wrench to lower the rack leveling pads, and while adjusting the pads use a

bubble level to verify the rack is plum and level.

2. Use a 1/2 in. wrench to install the stabilizer on the front of the rack.

Note: The stabilizer must remain connected to the rack. It should only be removed

when you are relocating the rack.

1. Stabilizer
2. Mounting screw (4X)
3. Leveling pad

C53255

1

3

2

Advertising