Check to see if the switch has been reset, Check the power going to the switch, Sun proprietary/confidential: internal use only – Sun Microsystems 6900 User Manual

Page 102

Advertising
background image

82

Sun StorEdge 3900 and 6900 Series 2.0 Troubleshooting Guide • March 2003

Sun Proprietary/Confidential: Internal Use Only

TABLE 7-2

lists the switch events for Sun StorEdge network FC switch-8 and switch-

16 2 Gbit switches.

TABLE 7-2

Storage Automated Diagnostic Environment Event Grid for 2 GBit Switches

Component

EventT

ype

Se

verity

Action

Description

Note:

T

e

xt

within

quotation

marks

(“

“)

is

e

xactl

y

as

it

appear

s

o

n

the

Event

Grid.

Action

Required

chassis.
fan

Alarm-

Yellow

Y

“chassis.fan.1 status
changed from OK”

None.

chassis.
board

Alarm-

Yellow

Y

The uptime of the switch
was less than the previous
uptime of the switch. This
could indicate that the
switch has been reset either
by a user or by the loss of
power.

1. Check to see if the switch

has been reset.

2. Check the power going

to the switch.

chassis.
power

Alarm

Yellow

“chassis.power.1 status
changed from OK”

This event monitors
changes in the status of the
chassis’ power supply, as
reported by the SANbox
chassis status.

None.

system_
reboot

Alarm

Yellow

“Switch sw1a was rezoned”

This event reports changes
in the zoning of a switch.

enclosure

Audit

“Auditing a new switch
called

ras d2-swb1

(ip=xxx.0.0.41)

10002000007a609”

oob

Comm_
Established

“Communication regained
with

sw1a

(ip=

xxx.

20.67.213)”

Advertising