Remote alarm test, Alarm test, continued – GE Industrial Solutions Galaxy Verification User Manual
Page 20
Advertising
Galaxy Power System Verification Procedures
2 - 8 Galaxy SC Controller Performance Verification Procedures
Issue 3 January 2008
Alarm Test, continued
Remote Alarm Test
Using EasyView to perform the Alarm Test, hardware switches
SW202-5 on the BJB board and SW204-2 on the BJH board must first
be enabled, in addition to the software switches located at menu path.
EasyView: CONFIGURE
→ DC PLANT → HARDWARE AND
SOFTWARE CONFIGURED
Both the Alarm Test and Remote Alarm Test fields must be enabled.
Initiate the test remotely with the EasyView path:
CONTROL
→ ALARM TEST.
Follow the status of the test remotely with the EasyView path:
STATUS
→ ALARM TEST.
Advertising