Battery discharge test, continued – GE Industrial Solutions Galaxy Verification User Manual

Page 65

Advertising
background image

Galaxy Power System Verification Procedures

Issue 3 January 2008

Galaxy Millennium Controller Performance Verification Procedures 3 - 21

Battery Discharge Test, continued

Discharge Menu,

continued

NUM STRING: Use the <+> and <-> keys to select the number of
strings installed on the site. (Range is 1 to 32 strings, default is 2.) Press
<ENTER> to save.

END V/CELL: Use the <+> and <-> keys to select the cell voltage at
the end of the discharge test. (Default value is 1.75V, and is adjustable
between 1.75V and 1.95V.) Press <ENTER> to save.

BAT CLASS: Use the <+> and <-> keys to select flooded or sealed.
Press <ENTER> to save. Note: Use this feature only is the basic
controller is present.

Configuration

Configuration may be done locally at the front panel or remotely via
EasyView interface.

Basic: MENU

CONFIG.. BAT TEST

Intelligent: MENU

CONFIG.. BAT MNGR → BAT DISCH..

EasyView: CONFIG

BATTERY MANAGEMENT RESERVE

To initiate the test, the plant must be operating in the Float mode with
no active alarms and only serial type rectifiers connected. The test can
be controlled either locally at the front panel or remotely via EasyView
interface by toggling the BAT DISCH TST software switch.

Basic: MENU

MAINT OPER.. BAT DISCH TST

Intelligent: MENU

MAINT OPER.. BAT DISCH TST

EasyView: CONTROL

BATTERY TEST