Local alarm test, Alarm test, continued – GE Industrial Solutions Galaxy Verification User Manual

Page 47

Advertising
background image

Galaxy Power System Verification Procedures

Issue 3 January 2008

Galaxy Millennium Controller Performance Verification Procedures 3 - 3

Alarm Test, continued

Local Alarm Test

Refer to Figure 3-1 for the Millennium switch positions referred to in
this test.

Prior to performing an Alarm Test, hardware switch SW202-5 on the
BSH board must be enabled, in addition to the software switch located
at menu path:

Basic: <MENU>

→ CONFIG → ALARM → TEST ALM

Intelligent: <MENU>

→ CONFIG → ALARM → TEST ALM

If HVSD is desired during the test, BSH SW202-4 must also be enabled,
along with the appropriate software switch found on the front panel
under the path: MAIN

→ CONFIG → ALARM → TEST HV, and each

plant rectifier must have a load of at least 10% of its capacity.

To perform the Alarm Test from the front panel, follow the menu path:

Basic: <MENU>

→ MAINT OPER → ALARM TEST

Intelligent: <MENU>

→ MAINT OPER → ALARM TEST

As an alternative to the front panel configuration of the Alarm Test
software switch, it may be also configured within EasyView under the
path: CONFIGURE

→ DC PLANT → HARDWARE & SOFTWARE

CONFIGURED.

Pressing the <ENTER> key while the cursor is on the ALARM TEST
field will provide the message “ALARM TEST STARTED.” Use the
<ESC> key to return to the MAINTENANCE OPERATION screen and
follow the relay operation in the ALARM TEST STAT: field. Pressing
<ENTER> while the cursor is on the ALARM TEST field will restart
the test.

Note: Front panel LEDs do not activate during the Alarm Test. the
alarms can be monitored by checking on the BSL alarm board.