Gps2424 replacement procedures, continued – GE Industrial Solutions Galaxy Verification User Manual

Page 79

Advertising
background image

Galaxy Power System Verification Procedures

Issue 3 January 2008

Replacement Procedures 4 - 11

GPS2424 Replacement Procedures, continued

Installing or

Replacing a 596B3

Rectifier, continued

Step

Action

5

Slowly slide new rectifier onto the shelf until it contacts the
rear connector.

6

Using the Allen wrench, turn the Allen-head bolt clockwise
to pull the rectifier into the shelf.

7

Once the rectifier has been installed, set the rectifier ID.
(Refer to product manual.)

Note: The red LED on the rectifier will blink until the
rectifier establishes communication with the controller.
After communication is established, the controller will issue
a RECT MAJ alarm until the rectifier ID is set.

8

Turn the ac service back on.

9

Turn the rectifier’s ON/STBY switch to ON.

!

Advertising