Gps4812 replacement procedures, Installing or replacing a 596a rectifier, Figure 4-4: detail of 596a rectifier position – GE Industrial Solutions Galaxy Verification User Manual

Page 84: Gps4812

Advertising
background image

Galaxy Power System Verification Procedures

4 - 16 Replacement Procedures

Issue 3 January 2008

GPS4812 Replacement Procedures

Installing or

Replacing a 596A

Rectifier

Step

Action

1

Locate and turn off the ac service feeding the rectifier.
Note: Do not turn off ac service to the entire system, only to
the rectifier that has failed.

2

Turn the rectifier’s ON/STBY switch to STBY.

Caution

Rear portion of the rectifier that is in operation is HOT to
the touch. Use appropriate precautions.

3

(Steps 3 and 4 for replacement only. For a new installation,
proceed to Step 5.)

Locate the Allen-head bolt in the center of the rectifier front
panel. Using the Allen wrench provided, rotate the bolt
counterclockwise to release the rectifier for removal.

4

Caution

Handle the rectifier using two hands, one hand supporting
the rear of the unit, the other hand on the front handle.

Grasp the front handle and slide/pull the rectifier from the
shelf assembly. Support the rear of the unit as it slides from
the shelf.

Figure 4-4: Detail of 596A Rectifier Position

5

Slowly slide new rectifier onto the shelf until it contacts the
rear connector.

6

Using the Allen wrench, turn the Allen-head bolt clockwise to
pull the rectifier into the shelf.

Continued on next page.

Advertising