Gps4848 replacement procedures, continued – GE Industrial Solutions Galaxy Verification User Manual

Page 87

Advertising
background image

Galaxy Power System Verification Procedures

Issue 3 January 2008

Replacement Procedures 4 - 19

GPS4848 Replacement Procedures, continued

Installing or

Replacing a 595A

or 595B Rectifier,

continued

!

Step

Action

3

Install the rectifier. See Figure 4-5.

a. Verify the output circuit breaker is OFF and that the

rectifier power switch is in the “Standby” position.

b. Slide the unit slowly onto the shelf until it contacts the

rear connector.


Note: Install rectifiers vertically, starting at the bottom
position and working upward.

c. Remove the label over the access window. Using a 5mm

Allen-head “T” wrench, turn the locking screw clockwise
to secure the rectifier to the shelf.

Rectifier Shelf
in Cabinet

Rectifier

Insertion Tool

Figure 4-5: Installing a Rectifier in a Rectifier Shelf

Continued on next page.

Advertising