Battery discharge test, continued – GE Industrial Solutions Galaxy Verification User Manual

Page 42

Advertising
background image

Galaxy Power System Verification Procedures

2 - 30 Galaxy SC Controller Performance Verification Procedures

Issue 3 January 2008

Battery Discharge Test, continued

Procedure

Step

Action

1

Enable BATT TEST:

MENU

BATTERY MANAGEMENT BAT DISCH

Note: Once the other parameters on this screen are configured,
do not modify until any system changes are made.

2

Press <ENTER> to confirm test to proceed. Controller will
perform the battery discharge test.

3

Verify:

BD alarm will turn On and Status LED will show Green
(NORM).

Controller display will show BATT TEST at bottom left
and RESERVE TEST IN PROGRESS on bottom right.

4

To abort Battery Discharge Test:

a. Follow menu path

MENU

→ ΜΑΙΝΤ ΟPER → BAT DISCH TST

b. Verify that display shows “Battery Discharge Test

Aborted.”

Note: The Battery Discharge Test is for informational and planning
purposes only. It does not constitute the basis for warranty resolutions.

If the test is aborted due to an alarm, the Reserve Time message is
displayed as “Alarm Abort” and a user clearable minor alarm is
generated. If the test is aborted due to any of the other conditions shown
above, the Reserve Time message is displayed as “Check Battery” and
a user clearable minor alarm is generated.

Advertising