High voltage shutdown test, Overview – GE Industrial Solutions Galaxy Verification User Manual

Page 51

Advertising
background image

Galaxy Power System Verification Procedures

Issue 3 January 2008

Galaxy Millennium Controller Performance Verification Procedures 3 - 7

High Voltage Shutdown Test

Overview

A High Voltage Shutdown signal (HVSD) may optionally be sent to the
rectifiers during the alarm test by enabling the hardware switch
SW202-4 on the BSH board and the software switch at menu path:

Basic: <MENU>

→ CONFIG → ALARM → TEST HV

Intelligent: <MENU>

→ CONFIG → ALARM → TEST HV

Use the ADJUST <+> <-> keys to change the value of the TEST HV
field, then press <ENTER> to save the change.

Note: The High Voltage Shutdown Test is not recommended for an
existing installation. However, if this test must be done, make sure that
the battery reserve can support the load for the period until the rectifier
is recycled.

Verify the Auto Restart hardware switch at SW202-7 on the BSH board
is set to 1 (Enabled). Verify the software switch for the Auto Restart
feature is enabled from the front panel. MAIN

→ CONFIG → RECT

CTR

→ AUTO RST

Advertising