High voltage shutdown test, Overview – GE Industrial Solutions Galaxy Verification User Manual
Page 51
Galaxy Power System Verification Procedures
Issue 3 January 2008
Galaxy Millennium Controller Performance Verification Procedures 3 - 7
High Voltage Shutdown Test
Overview
A High Voltage Shutdown signal (HVSD) may optionally be sent to the
rectifiers during the alarm test by enabling the hardware switch
SW202-4 on the BSH board and the software switch at menu path:
Basic: <MENU>
→ CONFIG → ALARM → TEST HV
Intelligent: <MENU>
→ CONFIG → ALARM → TEST HV
Use the ADJUST <+> <-> keys to change the value of the TEST HV
field, then press <ENTER> to save the change.
Note: The High Voltage Shutdown Test is not recommended for an
existing installation. However, if this test must be done, make sure that
the battery reserve can support the load for the period until the rectifier
is recycled.
Verify the Auto Restart hardware switch at SW202-7 on the BSH board
is set to 1 (Enabled). Verify the software switch for the Auto Restart
feature is enabled from the front panel. MAIN
→ CONFIG → RECT
CTR
→ AUTO RST