Galaxy Power System Verification Procedures

3 - 4 Galaxy Millennium Controller Performance Verification Procedures

Issue 3 January 2008

Alarm Test, continued

Local Alarm Test,

continued

The Alarm Test will operate, in sequence, each of the relays shown
below for a default interval of approximately 60 seconds. This interval
for each relay’s activation during this test may optionally be set in an
intelligent controller via EasyView path: MAIN

→ CONFIGURE →

ALARM TEST.

Initiate Alarm Test locally by pressing the <MENU> key to bring up the
MAIN screen and following the path: MAINT OPER

→ ALARM

TEST

. The ALM TEST STAT field of this same screen can then be used

to follow the progress of the alarm text.

The progress of the activated relays can also be followed during the test
by sensing for continuity on the appropriate positions of the BSL alarm
board if the connected alarm system is not yet processing.

High Voltage Shutdown - HVSD*
Rectifier Fail Alarm Test - RFAT**
Power Critical - PCR
Power Major - PMJ
Power Minor - PMN
Major Fuse - MJF
Minor Fuse - MNF
Battery on Discharge - BD
AC Fail - ACF
Rectifier Fail Alarm - RFA
User Relay 3 - UR3***
High Voltage - HV
Controller - CTLR
User Relay 1 - UR1***
User Relay 2 - UR2***

*HVSD is optional.

**RFAT is an alarm test intended for use with non-serial type rectifiers
and has no function in this test.

***UR1, UR2, and UR3 are inhibited if LVD Contactors have been
configured and a Bay Interface Card is not configured in the system.

Follow the status of the test remotely with EasyView path: STATUS

ALARM TEST.