Galaxy Power System Verification Procedures

Issue 3 January 2008

Galaxy SC Controller Performance Verification Procedures 2 - 15

High Float Voltage Alarm/High Voltage Shutdown Alarm
Tests, continued)

HVSD Test

Procedure for

Serial Rectifiers,

continued

Step

Action

8

The controller will wait 5-6 minutes and issue one final
restart signal, initiating the final sequence of shutdown and
restart events before the rectifier locks out, requiring
personnel intervention.

Prior to this occurring do the following:


a. From the front panel follow the path <MENU>

CONFIG

→ RECT MNGR → [RECT OPER] → PLANT

V (FLOAT).


Note: Menu item in [] used in intelligent controllers only.

b. Use the <ADJUST> keys to change the value of the plant

voltage to its normal level. Press <ENTER> to save the
change.

c. Press <MENU> and select MAINT OPER

→ RECT

RESTART. Press <ENTER> to restart the rectifier.


Note: Restarting the rectifier from the front panel in this
manner, rather than toggling the rectifier's ON/
STANDBY switch, resets the HVSD timer so that another
rectifier can be tested immediately. Testing of the
additional rectifiers in the same manner is at the user’s
discretion

.