Galaxy Power System Verification Procedures

Issue 3 January 2008

Galaxy SC Controller Performance Verification Procedures 2 - 31

Battery Discharge Test, continued

Test Completion

The test is completed when approximately 20 percent of anticipated
battery capacity is depleted.

At the completion of the test, BD and VLV alarm thresholds continue to
be inhibited for 3 additional minutes to allow the batteries to recharge.
A successful test displays the calculated value in the Reserve Time field;
default menu in the intelligent controller or menu path MENU

MAINT OPER.. in the basic controller. Reserve time in EasyView is
displayed at menu path: STATUS

DC PLANT.