5.9 Inspections to be performed prior to installation

Table 9: Pre-installation inspection checklist

TYPE OF CHECK

REQUIREMENT

VALUE /

VERIFICATION

Recommended: between +59 ° F and +77 ° F

(+15 °C and +25 °C)

1. Ambient temperature in the immediate

location of the equipment

Required: between +14 °F and +104 °F

(–10 °C and +40 °C)

2. Humidity and condensation

Verify that there is no water condensation or

dampness within the installation site

3. Ventilation

Verify that sufficient airflow or forced ventilation is

provided for battery cabinets location

4. Foundation and route to installation site

Verification of adequate structure, space and

clearance for dimensions and weights of the UPS
units and their battery cabinets

5.

When planning the location of the UPS
units, room for access to battery
cabinets and electrical boards is
critical.

Verify 36 in. (91 cm) clearance at rear for access to

cable connections and fuses, and 39 in. (100 cm)
clearance at front for user access and service.

6.

Circuit breakers on the electrical board
supplying the system

Must be in accordance with Gamatronic.'s system

specifications and connection schematic

7.

Diameter of input and output power
cable connections, PE (Gnd) and
neutral lines.

Must comply with local and international codes, and

be appropriate for the circuit breakers protecting
them. Refer to connections schematic.

8.

Lightning / Voltage surge protection on
electrical board supplying the system.

Voltage surge suppressors type B are

recommended to be installed between each phase
and the neutral line:

Ratings: 150 Vac for 110-120 Vac mains.

Phase-to-Phase: 3x208* Vac, +15 %, -25 %

L1-L2
L2-L3
L3-L1

9. Ac input voltage

Phase-to-Neutral: 120* Vac, +10 %, -15 %

L1
L2
L3

10. Voltage between neutral and ground

0 – 2 Vac

11. System installation and start-up

Must be performed only by authorized personnel in

accordance with connection schematic,
Gamatronic.'s system specifications and this User
Guide


* Or other, according to nominal voltage rating of local power mains.