Checks to be performed following initial startup, Table 11: post-installation inspection checklist – MaxPower Corp Gamatronic Power+ M50-RM User Manual

Page 70

Advertising
background image

Gamatronic Electronic Industries Ltd.

POWER+ RM

50

K

VA, N.Am. Std. – User Guide, Release 1.9

54

5.12

Checks to be performed following initial startup

Table 11: Post-installation inspection checklist

TYPE OF CHECK

REQUIREMENT

RESULT

Phase-to-phase:
Not less than 2 % below no-load values
measured in item 5 below.

L1-L2
L2-L3
L3-L1

1.

Ac input voltage during operation under load.
Take measurements on the input terminals of
the system.

Phase to Neutral:
Not less than 2 % below no-load values
measured in item 5 below.

L1
L2
L3

2.

With no load on the system, measure current
circulation between the units.

I

rst should be <10 A

3.

With no load on the system, measure the dc
voltage of the system.

Total dc voltage between + and –
terminals should be between 384 V and
432 V.

(+) — (–)

4.

Voltage between neutral and ground during
operation under load
On the input terminals of the system

0–2 Vac

5. System output voltage

120 V +/- 2 %
or other according to system specifications

6. Total system load / output current

Verify that the system is not overloaded in
relation to system specifications

7. Correct and orderly operation

Verify that the UPS is operating normally in
accordance with this User Guide and that no
alarms or fault indications are evident

NOTE: It is the responsibility of the customer to notify Gamatronic Electronic Industries Ltd. to receive

approval for any deviations from these requirements.


T

O COMPLETE THIS INSTALLATION CHECKLIST

,

PLEASE SKETCH ON THE

FOLLOWING PAGE A DIAGRAM OF YOUR SYSTEM

'

S CONNECTIONS

,

OR INCLUDE A

FORMAL CONNECTION SCHEMATIC

,

AND FAX PAGES

46,

54,

AND

55

TO YOUR

VENDOR

.

Advertising