Ashcroft ATE-2 - Handheld Calibrator User Manual

Page 72

Advertising
background image

70

8. Upon completion of the Linearization process, the HHC will

prompt “Apply new cal” function to save the results of the

entire procedure. Also at this time, each individual component

of calibration (Cal Zero, Cal Full Scale & Cal Linearity) can be

returned to, redone and saved individually.

9. To proceed with saving the entire Calibration, press

“ENTER”. The system will display: “Saving Parameters. This

will take a few seconds” and then return to the Pressure

Measuring Screen.

10. The pressure module field calibration process is complete.

NOTE: If the field calibration process needs to be interrupted,

use the ESC key to revert back to a previous step in the pro-

cedure. Several sequential ESC commands will return the

system to a pressure-measuring mode. This will work in any

part of the process, except when the data is being acquired.

The data inquiry can be aborted by pressing the MENU key –

this will return the system back to the MAIN MENU screen.

New calibration data is being saved to the module EEPROM

only when the “Apply new cal” function is performed. If this

was not done during the field calibration process – the system

will have no permanent changes. As soon as the power is

recycled, the unit will return to “pre-calibration” state.

The “Cal Linearity” procedure must be completed in its

entirety (all linearity points have to be taken) in order to save

new linearity corrections. If during “Cal Linearity” procedure

the ESC key was pressed before all linearity points were

taken, the partial linearization data will be discarded.

Ꮨƽ

SECTION 15 o.

PRESSURE MODULE CALIBRATION

CONT.

Advertising