3 going online, 1 compiling the project data, 4 loading and starting the plc program – Lenze PLC Designer ApplicationTemplate (PLC Designer R3-x) User Manual

Page 33: Going online, Compiling the project data, Transferring the project to the control - "log in, Loading and starting the plc program, Going online ( 33), Compiling the project data ( 33), Loading and starting the plc program ( 33)

Advertising
background image

Lenze · ApplicationTemplate · 1.3 EN - 04/2013

33

Opening the ApplicationTemplate

Going online

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7.3

Going online

In order to be able to establish an online connection to the controller, the communication settings

(Set active path) must be commissioned before.



Establishing communication with the controller

( 13)

7.3.1

Compiling the project data

To compile the project data, select the BuildBuild menu command or press the <F11> function

key.

• If errors occur during the compilation, they are to be localised on the basis of the »PLC Designer«

error messages and corrected correspondingly. Recompile the project data afterwards.

• If no errors occur during the compilation, the »PLC Designer« project must be saved:

File

Save project

7.3.2

Transferring the project to the control - "Log in"

The desired project must be transferred to the PLC device by "Logging in" to the controller: Call menu

command Online

Log in.

7.4

Loading and starting the PLC program

• Load the PLC program to the controller: Call OnlineLoad menu command.
• Start the PLC program: Call OnlineStart menu command.
• As an alternative, you can execute the DebugStart menu command or press <F5>.

Tip!
In order to load a project automatically after a device is restarted, it can be defined as

"boot project".

Setting up the project as boot application

How to install the project as boot project:

1. Select the OnlineGenerate boot project for L-force Controller menu command.

Note!

To "log in" the PLC program must be error-free. For this it must be possible to execute the

BuildBuild (F11) menu command without an error message.

Advertising