Top exiting load cables – Rockwell Automation 1512B MV Controllers, 200/400A Two-High Cabinet, Standard and Arc-Resistant Enclosure User Manual

Page 41

Advertising
background image

Rockwell Automation Publication 1500-UM055G-EN-P - May 2013

33

Installation – Arc-Resistant Enclosure (ArcShield)

Chapter 3

4. Remove the appropriate load cable conduit openings in the top or bottom

of the cabinet (see

Figure 36

or

Figure 37

).

Top Exiting Load Cables

5. Load cables for the bottom power cell should be routed first. Pull the

cables into the cabinet through the appropriate opening (see

Figure 36

).

Run the cables behind the current transformer mounting plate and into
the bottom power cell.

6. For the top power cell, pull the cables into the cabinet through the

appropriate opening (see

Figure 36

).

Figure 36 - Load Cable Conduit Openings

7. Connect the cables to the current transformers and tighten the

connections to 65 N•m (48 lb•ft).

8. Connect cable shields to the ground lug.

9. Reinstall the cable duct boot and reassemble the cabinet.

TIP

Follow steps 1-4 from previous section.

Top of Cabinet

Load Cable Conduit Opening for
Cables from Top Power Cell

Load Cable Conduit

Opening for Cables from

Bottom Power Cell

Current Transformer

Mounting Plate

ATTENTION: Ensure all barriers are replaced before re-energizing the
equipment. Failure to do so may result in electrical faults and cause
damage to equipment or serious injury to personnel.