Step 3 – sequence of final assembly, Step 2 – alignment of “side-by-side” plenums – Rockwell Automation 1512B MV Controllers, 200/400A Two-High Cabinet, Standard and Arc-Resistant Enclosure User Manual

Page 90

Advertising
background image

82

Rockwell Automation Publication 1500-UM055G-EN-P - May 2013

Appendix

B

ArcShield Plenum Installation Instructions

Figure 81 - Aligning “Side-by-Side” Plenums

STEP 3 – Sequence of Final
Assembly

All Plenums in a Line-up must be mounted to the top of each enclosure and to
the Plenum directly beside it before the front duct sections are re-attached (see

Figure 77

).

Figure 82 - Sequence of Final Assembly

IMPORTANT

Any unused holes must be filled with thread forming screws. i.e.: “Lifting Lug
holes”.

All Gaps must be sealed and filled with silicone.

End Cover Plate

Advertising