Rockwell Automation 1408-EMxx PowerMonitor 1000 Unit User Manual

Page 74

Advertising
background image

74

Publication 1408-UM001B-EN-P - May 2008

Appendix A Powermonitor 1000 Data Tables

3

30507-8

Demand PF

-100.0…+100.0

The average demand for PF during
the last demand period.

4

30509-10

Projected kWatt
Demand

+/- 0.000…9,999,999

The projected total real power for
the current period.

5

30511-12

Projected kVAR
Demand

+/- 0.000…9,999,999

The projected total reactive power
for the current period.

6

30513-14

Projected kVA
Demand

0.000…9,999,999

The projected total apparent power
for the current period.

7

30515-16

Elapsed Demand
Period Time

0.00…99.99

The amount of time that has
elapsed during the current period.

8

30517-18

Metering Iteration 0…9,999,999

Increments by 1 for each new
metering calculation.

Demand Results

Element
No.

Modbus
Address

Element Name

Range

TR1

TR2

EM1

EM2

EM3

Description

Unit Status Log Results Parameters

CSP File No.

N25

CIP Instance

18

Applies to

All models

No. of Elements

13

No. of Words

13

Data Type

Integer

Data Access

Read

Unit Status Log Results

Element
No.

Modbus
Address

Element Name

Range

Description

0

30601

Status Record Internal
Identifier

1…50

Used to verify record sequence when returning multiple
records.

1

30602

Timestamp Year of record

-

The year when the record was recorded.

2

30603

Timestamp Month/Day

-

The month and day when the record was recorded.

3

30604

Timestamp Hour/Minute

-

The hour and minute when the record was recorded.

4

30605

Timestamp
Seconds/Hundredths

-

The seconds and hundredths when the record was recorded.

5

30606

Status Event Type

0…512

Indicates the type of status event that has occurred.

6

30607

General Code

0…4096

Indicates general information about the status event.

7

30608

Information Code

0…256

Indicates specific information about the status event.

Advertising
This manual is related to the following products: