Rockwell Automation 1738-AENTR, Series B POINT I/O and ArmorPOINT I/O Dual Port EtherNet/IP Adapters User Manual User Manual

Page 20

Advertising
background image

12

Rockwell Automation Publication 1734-UM017B-EN-P - October 2013

Chapter 2 Install Your POINT I/O or ArmorPOINT I/O Adapter

Mount the ArmorPOINT I/O Adapter on a Panel or Wall

To mount the ArmorPOINT I/O adapter on a wall or panel, use the screw holes
provided in the adapter module

.

Refer to the drilling dimensions illustration for the ArmorPOINT I/O adapter
with I/O bases to guide you in mounting the adapter and I/O module mounting
bases.

Mounting illustration for the ArmorPOINT adapter and I/O Mounting bases

Install the adapter and its I/O mounting base as follows:

1. Lay out the required points as shown above in the drilling dimension

drawing.

2. Drill the necessary holes for M4 (#8) machine or self-tapping screws.
3. Mount the adapter using M4 (#8) screws.
4. Ground the system using the ground lug connection in the adapter’s I/O

base. (The ground lug connection is also a mounting hole).

5. Add one or more I/O modules and their respective I/O Mounting bases to

the adapter and its I/O Mounting base as required. See

Install

ArmorPOINT I/O Modules

on

page 13

for details.

ATTENTION: This product is intended to be mounted to a well-
grounded mounting surface such as a metal panel. Additional
grounding connections from the power supply's mounting tabs or DIN
rail (if used) are not required unless the mounting surface cannot be
grounded. Refer to Industrial Automation Wiring and Grounding
Guidelines, Rockwell Automation publication

1770-IN041

, for

additional information.

45175

Adapter

46.2 mm
(1.82 in)

52.0 mm
(2.05 in)

20.0 mm
(0.79 in)

52.0 mm
(2.05 in)

52.0 mm
(2.05 in)

20.0 mm
(0.79 in)

56 mm
(2.20 in)

102 mm
(4.01 in)

Advertising