MODEL 227

OPERATION MANUAL

Doc # 740063 Rev E

SECTION VIII - OPTIONS

8.1

M227/207-CW & M207-CW COOLING UNIT SPECIFICATIONS/INSTALLATION

4. Installation

3. Before mounting the M277/207-CW or M207-CW on to the M-227 remove

the fill cap and add the water. Replace the fill cap. Remove the pins

attached to each corner post (see figure 9). Locate the CW Power Cord

exiting a hole in the top of the CW unit. Pull enough of the cord out so it

dangles over the side of the unit.

4. Move the M-227 onto the CW unit and insert the corners onto the posts

of the CW Unit. Locate the M-227 Coolant Unit Connector located on the

panel on the AC Input side of the M-227. Insert the CW cable connector

into the M-227 connector. Secure the CW unit with the pins that were

removed (figure 9).

5. Install the adapter cable coolant hoses per section III. Re-connect the M-227

power cable.

5. Operation

1. When all connections have been made per Section III and a coolant flow

path is created, turn the M-227 ON and set the CW ON/OFF

switch to ON. The pump should start circulating coolant.

WARNING

DO NOT OPERATE the water cooling unit WITHOUT coolant in the tank

OR WITHOUT a water flow path (water OUT to IN through a weld head).


2. Both CW units contain a flow sensor. If the Set Up Screen Coolant Fault

Mode is ON the M-227 will look to see if the Cooling Unit is connected. If

it is, the M-227 will require that coolant be flowing or else it will create a fault.

If for some reason the Cooling Unit is connected but not being used the

operator can change the Coolant Fault Set Up to OFF and no coolant fault

will be detected.

CAUTION

Severe damage to the weld head and cables can occur if you have the Coolant Fault turned

OFF and are operating a weld head that needs coolant and then you forget to turn the cooler

on or to make the connections.

3. The above is the basic operation. The only decision to be made is whether

COOLANT is required. Some weld heads need it, some do not, depending

on the type of weld and duty cycle. Consult with an AMI representative as

to cooling requirements.