Haul, Load – Ditch Witch JT100AT User Manual

Page 108

Advertising
background image

JT100/JT100 All Terrain Operator’s Manual

Transport - 107

Haul

CMW

©

Haul

Load

1.

Fasten and adjust seat belt.

2.

Start drilling unit engine.

3.

Move drilling unit to rear of trailer and align with ramps or center of trailer bed.

4.

Slow engine to low throttle and slowly drive unit onto trailer.

5.

Lower stabilizers to trailer floor.

6.

Lower drill frame to trailer floor.

7.

Stop engine when unit is safely positioned on trailer bed.

8.

Attach tiedowns to drilling unit where tiedown decals are located.

Crushing weight. If load falls or moves it could kill or crush

you. Use proper procedures and equipment or stay away.

To help avoid injury:

Load and unload trailer on level ground.

Incorrect loading can cause trailer swaying.

Attach trailer to vehicle before loading or unloading.

Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help
prevent trailer sway.

Advertising
This manual is related to the following products: