Ditch Witch JT100AT User Manual

Page 142

Advertising
background image

JT100/JT100 All Terrain Operator’s Manual

Systems and Equipment - 141

Driver/Loader Attachment

CMW

©

Remove Pipe Box

1.

Install pipe box lift mount (1) with pipe box pin
(3). Secure with lynch pin (2). For AT box,
ensure lift mount is locked in the correct
position.

Position A is for full pipe box.

Position B is for empty pipe box.

2.

Attach loader/driver clevis to pipe box lift
mount.

3.

Install and secure pins (shown) under and
over drill pipe at each end of pipe box.

4.

Unlock and remove pin (shown) from each
end of box.

5.

Use loader/driver boom and extension
controls to lift and move one pipe box.

6.

Return loader/driver to stow position and secure with stow strap before transporting.

NOTICE:

Lift only one pipe box at a time.

Before lifting, always inspect all lifting accessories, including pins, for cracks, bending or other signs

of wear. If worn or damaged, do not use. See your Ditch Witch

®

dealer for replacement parts.

NOTICE:

When lifting a heavy load, do not
operate loader/driver extension and
lift controls simultaneously. Operate
one at a time and at very slow
speeds.

When lifting fully-loaded AT pipe box,
remember that its weight will limit
loader/driver reach. See page 18 for
load chart capacities and “All Terrain
Pipe” on page 232 for pipe box
weight.

j31om006t.eps

Advertising
This manual is related to the following products: