JT100/JT100 All Terrain Operator’s Manual

Prepare - 85

Plan Bore Path

CMW

©

Bend Radius

JT100 Power Pipe

®

drill pipes have a tested minimum

bend radius of 205’ (62.5 m). This means that a 90°
bend in the bore path:

has a radius (A) of 205’ (62.5 m)

requires approximately 325’ (99 m) of drill pipe
(B).

JT100 Power Pipe Forged drill pipes have a tested
minimum bend radius of 197’ (60 m). This means that
a 90° bend in the bore path:

has a radius (A) of 197’ (60 m)

requires approximately 310’ (94.5 m) of drill
pipe (B).

JT100 All Terrain drill pipes have a tested minimum bend radius of 205’ (62.5). This means that a 90° bend
in the bore path:

has a radius (A) of 205’ (62.5 m)

requires approximately 325’ (99 m) of drill pipe (B).

NOTICE: Bending drill pipe more sharply than recommended will damage the pipe and cause failure
over time.

If bend radius is reduced, drill pipe life is reduced.

If bend radius is increased, drill pipe life is increased.

IMPORTANT: Use the charts on the next page to keep bends within safe limits.