Ditch Witch JT100AT User Manual

Page 124

Advertising
background image

JT100/JT100 All Terrain Operator’s Manual

Conduct a Bore - 123

Add Pipe

CMW

©

5.

Connect pipe to saver sub.

Move carriage forward until saver sub meets pipe.

Slowly rotate spindle clockwise. Carriage will move forward automatically as pipes thread together.

6.

Connect new pipe.

7.

Press and hold quick fill fluid pump switch until pipe fills and fluid pressure begins to rise.

8.

Rotate spindle.

9.

Slowly move carriage forward. Adjust rotation speed control according to bit size and soil conditions.

10. Engage and set cruise control as desired. See “Cruise Control” on page 172.

11. Monitor gauges.

12. Locate drill head with tracker at least every half-length of pipe.

IMPORTANT: Always rotate clockwise unless breaking pipe joint. Rotating counterclockwise will
unscrew joints.

Manual Pipeloader Controls

Automated Pipeloader Control

Slowly move carriage forward until pipe
ends touch.

To thread pipes together and fully torque
joint, slowly rotate pipe until spindle stops
turning and full pressure is developed.

Open wrench.

Open grippers.

Retract shuttles fully.

Lower pipe lifters.

Slowly move carriage forward until pipe
ends touch.

To thread pipes together and fully torque
joint, slowly rotate pipe until spindle stops
turning and full pressure is developed.

Open wrench.

Press resume. Green control cycle light
will come on.

Green control cycle light will come on,
grippers will open, shuttles will retract,
pipe lifters will lower, and then green
control cycle light will flash.

Advertising
This manual is related to the following products: