Operation – Ditch Witch JT100AT User Manual

Page 159

Advertising
background image

Systems and Equipment - 158

JT100/JT100 All Terrain Operator’s Manual

Tracker Control

CMW

©

Operation

Enable Thrust and Rotation

1.

Start drilling unit.

2.

Ensure that tracking unit is paired to tracking
display and enable tracker control. See
tracking system operator’s manual for
instructions.

3.

Remove tracker control key (1) from set-up
console at rear of drilling unit. Keep in tracker
operator’s possession.

4.

Drill and track bore.

5.

Remove tracker control key (1) from compartment outside drilling unit cab. Keep in tracker operator’s
possession.

6.

Drill and track bore.

Troubleshooting Tip: If thrust and rotation are not enabled:

Check whether the green tracker control
light (2), located on drilling unit anchoring
console, is on. If it is, communication has
probably stopped between tracker and
display, or tracker is set to incorrect code.

If communication cannot be restored, install
tracker control key in drilling unit and rotate
clockwise. Green tracker control light will go
off. Thrust and rotation will function.

NOTICE: Tracker operator cannot disable thrust
and rotation from tracker if tracker control key is
installed in drilling unit and turned to the disable
position.

Advertising
This manual is related to the following products: