Assemble voltage detector, Test strike system – Ditch Witch JT100AT User Manual

Page 148

Advertising
background image

JT100/JT100 All Terrain Operator’s Manual

Systems and Equipment - 147

Electric Strike System

CMW

©

Assemble Voltage Detector

1.

Drive voltage stake into ground at least 6’ (2 m)
away from any part of system.

2.

Clip voltage limiter to voltage stake.

Test Strike System

If system fails any part of this test, see “Troubleshoot Strike System” on the following page. Do not drill until
test is completed successfully.

1.

Turn on drilling unit.

2.

ESID control module will perform internal tests which check everything but alarms and strobe.

3.

If green OK indicator and electrical power supply indicator lights remain on, press self test button to
perform total test of strike system. During this test:

All lights should glow.

Alphanumeric readout should display numbers.

Alarms and strobes on all connected units should sound.

4.

If this test is successful, OK indicator and electrical power supply indicator lights will remain on.

5.

Use Electric Strike Simulator to test voltage and current sensors. See page 150.