Dunkirk Q90-200 Series II User Manual

Page 12

Advertising
background image

12

Condensate Drain Requirements
Pitch condensate drain line down to floor drain at

minimum of ¼” per foot (21mm/m). External condensate

pump (not furnished) may be used if floor drain is not

available. Condensate pump must be designed for flue gas

condensate application.
Condensate trap is proved with boiler.

1.

Build condensate trap in the field. See Figure 7.

2.

Wood frame or blocks may be used to raise boiler

to maintain drain pitch or to be above external

condensate pump reservoir.

3.

115 volt AC receptacle provided on service switch

junction box which is located at boiler right side,

to provide power for external condensate pump (if

needed).

Condensate Drain Piping

• Condensate trap is to be field installed as shown in

Figure 7

.

• Provided are ½” PVC fittings for condensate drain trap

(assembled in field).

• The ½” diameter schedule 40 PVC condensate drain

piping and pipe fittings must conform to ANSI standards

and ASTM D1785 or D2846.

• Schedule 40 PVC cement and primer must conform

to ASTM D2564 or F493. In Canada, use CSA or ULC

certified schedule 40 PVC drain pipe and cement.

• Condensate pump with reservoir (not furnished) may

be used to remove condensate to drain line (sanitary

line) above boiler if floor drain is not available or is

inaccessible

Filling Condensate Trap With Water
Manually fill condensate trap at initial start up with water

Following steps are required to fill condensate trap for

start up. Steps are only required at initial start up or if

maintenance requires draining of condensate trap:

1.

Pour about 1 cup of cold tap water into condensate trap

vent.

2.

Excess water will go through condensate drain line.

Verify proper operation of drain line (and external

condensate pump if used).

Chilled Water Piping
Install boiler used in connection with refrigeration system,

so chiller medium is piped in parallel with boiler with

appropriate valves to prevent chilled medium from entering

boiler.
Boiler piping system of hot water boiler connected to

heating coils located in air handling units where they may

be exposed to refrigerated air circulation must be equipped

with flow control valves or other automatic means to

prevent gravity circulation of boiler water during cooling

cycle.

4 - NEAR BOILER PIPING

Figure 8 - Condensate Trap and Vent

To Exhaust Vent

(2” CPVC)

½” Adapter

Male NPT x Socket

Weld PVC Piping

1 3/8” Long

To Boiler Flue Outlet (2” CPVC)

2” Male x 2” NPT Male PVC Bushing

1/2” PVC Elbow

1/2” PVC Piping 3 3/4” Long

1/2” PVC Elbow

1/2” PVC Piping 2” Long

1/2” PVC Piping 3 3/4” Long

1/2” PVC Tee

To Condensate Drain (Field Supplied)

2” NPT Male PVC Bushing

1/2” PVC Piping 12” Long

Advertising