Danger, Warning – Dunkirk Q90-200 Series II User Manual

Page 49

Advertising
background image

49

Annual Shut Down Procedure (End Of Each Heating

Season)

1.

Follow the instructions in “WHAT TO DO IF YOU SMELL

GAS” on page 29.

2.

If heating system is to remain out of service during

freezing weather, and does not contain antifreeze,

drain system completely. If boiler will be exposed

to freezing temperatures, drain condensate lines.

Otherwise, do not drain system or boiler.

Annual Examination And Cleaning Of Boiler

Components

1.

Examine flue passages. Remove blower assembly from

casting. Follow procedure for examining and cleaning

burner is described below.

Any buildup of sediment or aluminum oxide (white powdery

or flaky substance) in flue passages must be cleaned as

follows:

A. Remove jacket front and top panels.
B. Confirm manual gas valve is closed and disconnect

gas line to gas valve at union.

C. Disconnect wires to gas valve and igniter.
D. Remove air inlet assembly from gas valve.
E. Loosen, do not remove five nuts attaching blower

adapter assembly to boiler.

F. Remove two igniter screws. Carefully remove

igniter. Do not touch igniter element with your

fingers or hands as oils or debris will cause

premature failure.

G. Remove five nuts and blower adapter assembly.

Remove burner and gaskets.

H. Aluminum oxide deposits are water soluble and

may be rinsed away with spraying or running

water.

I. Use flexible handle nylon brush to loosen sediment

and aluminum oxide on all exposed heating

surfaces of boiler. Take care brush does not get

stuck in heat exchanger.

J. After brushing and rinsing, remove any remaining

loosened sediment using vacuum with snorkel

attachment.

K. Inspect burner for foreign matter in flame ports

or inside burner. Remove any foreign matter by

blowing with compressed air or vacuuming.

L. Install burner and gaskets. Position blower adapter

assembly over studs. Install five nuts, do not

tighten. Install igniter and igniter gasket and fasten

with two screws. Do not touch igniter element with

your fingers or hands as oils or debris will cause

premature failure. Tighten five nuts holding blower

adapter assembly.

M. Connect gas line to gas valve; air inlet assembly

to gas valve (using 2” x 1½” flexible coupling);

pressure switch hose to gas valve and air inlet

assembly; 2” flexible coupling to boiler exhaust

port; igniter wires; and gas valve wires.

2.

Visually inspect condensate trap. Clean out any visible

foreign material or debris from condensate lines as

described below.

A. Inspect for sediment or blockage.
B. Flush out with water or vacuum.
C. Follow instructions in “Near Boiler Piping” on page

8,

for filling condensate trap with water.

3.

Inspect flue connector using following steps.

A. Loosen clamp on draft inducer end of 2” flexible

coupling connecting vent tee to exhaust port.

B. Inspect interior of vent tee. Clean any buildup of

sediment on inside surface.

C. Connect 2” flexible coupling to draft inducer outlet.

16 - MAINTENANCE AND CLEANING

DANGER

Before servicing, turn off electrical power to boiler

at service switch. Close manual gas valve to turn

gas supply OFF to boiler. Failure to comply will result

in death or serious injury.

!

NOTICE

Perform regular service and maintenance by

qualified service agency at least once every 12

months to assure safe, trouble free operation and

maximum efficiency.

NOTICE

Verify proper operation after servicing.

WARNING

Following service procedures must be performed

by qualified service agent. Boiler owner shall not

attempt these steps. Failure to do so could result in

death or serious injury.

!

Advertising