Dunkirk Q90-200 Series II User Manual

Page 21

Advertising
background image

21

Check Gas Supply

• Gas pipe to boiler must be correct size for length of

run and total Btuh input of all gas utilization equipment

connected to it.

• See Tables 9 and 10 for proper size. Refer to NFPA54

for additional tables.

• Verify your gas line complies with local codes and gas

company requirements.

Table 8 - Gas Supply Pressure

Pressure

Natural Gas

Propane Gas

Minimum

4” w.c.

10” w.c.

Maximum

10” w.c.

14” w.c.

Please check line pressure while unit is running.

Table 9 - Natural Gas Piping Sizes

Pipe Length

Pipe Capacity - BTU/Hr. Input

(1)

½”

¾”

1”

1¼”

20’

92,000

190,000

350,000

625,000

40’

63,000

130,000

245,000

445,000

60’

50,000

105,000

195,000

365,000

Table 10 - Propane Gas Piping Sizes

Pipe

Length

Pipe Capacity - BTU/Hr. Input

(1)

Copper Tubing

(2)

Iron Pipe

⅝”

¾”

½”

¾”

20’

131,000

216,000

189,000

393,000

40’

90,000

145,000

129,000

267,000

60’

72,000

121,000

103,000

217,000

(1)

Includes Fittings

(2)

Outside Diameter

Connecting Gas Piping

Refer to Figure 14 for general layout at boiler. Gas line

enters boiler through left side panel.
Boiler is equipped with ½” NPT connection on gas valve for

supply piping and ½” NPT ball valve for manual shut off.

Following rules apply:

1.

Use only those piping materials and joining methods

listed as acceptable by the authority having jurisdiction,

or in the absence of such requirements, National Fuel

Gas Code, ANSI Z223.1/NFPA 54.

2.

Use pipe joint compound suitable for liquefied

petroleum gas on male threads only.

3.

Use ground joint unions.

4.

Install sediment trap upstream of gas controls.

5.

Use two pipe wrenches when making connection to gas

valve to keep it from turning.

6.

Install manual main shutoff valve in vertical pipe about

5 feet (1.5m) above floor outside boiler jacket.

7.

Tighten all joints securely.

8.

Propane gas connections made by licensed propane

installer.

9.

Two stage regulation used by licensed propane

installer.

10.

Propane installer to verify Propane gas piping.

11.

Recommend use ½” union suitable for natural and

propane gas after ball valve to facilitate service on unit.

Leak Check Gas Piping
Pressure test boiler and gas connection before placing

boiler in operation.

• Pressure test over 1/2 psig (3.5 kPa). Disconnect boiler

and its individual gas shutoff valve from gas supply

system.

• Pressure test at 1/2 psig (3.5 kPa) or less. Isolate boiler

from gas supply system by closing manual gas shutoff

valve.

• Locate leakage using gas detector, noncorrosive

detection fluid, or other leak detection method

acceptable to authority having jurisdiction. Do not

use matches, candles, open flames, or other methods

providing ignition source.

• Correct leaks immediately and retest.

8 - GAS SUPPLY PIPING

Figure 15 - Gas Piping

Length of pipe or tubing should be measured from gas

meter or propane second stage regulator.