Warning – Dunkirk Q90-200 Series II User Manual

Page 22

Advertising
background image

22

WARNING

Electrical shock hazard. Turn OFF electrical power

supply at service panel before making electrical

connections. Failure to do so could result in death

or serious injury.

!

NOTICE

Use copper conductors only.

Electrically bond boiler to ground in accordance with

requirements of authority having jurisdiction. Refer to

National Electrical Code, ANSI/NFPA 70.

Electric Power Supply
Turn OFF electrical power supply at service panel and boiler

before making electrical connections.

• Run 120 volt circuit from separate over current protection

device in electrical service entrance panel, 15 ampere

circuit.

• Service switch is pre-wired and located on exterior boiler

jacket. See Figure 15 for location of service switch,

junction box, and power supply connection points.

• Connect black (hot) lead from power supply to either of

unused brass screws on service switch.

• Connect white (neutral) lead from power supply to white

screw on service switch.

• Connect green (ground) lead from power supply to

ground (green) screw on service switch.

• Receptacle on service switch is powered regardless of

whether switch is on or off, and could be used as power

supply for external condensate pump if one is used.

• Run 14 gauge or heavier copper wire from boiler to

grounded connection in service panel or properly driven

and electrically grounded ground rod.

9 - ELECTRICAL WIRING

Figure 16 - Field Wiring Connection

Service Switch

Junction Box

Advertising