Dunkirk Q90-200 Series II User Manual

Page 7

Advertising
background image

7

6.

After it has been determined each appliance remaining

connected to common venting system properly vents

when tested as outlined above, return doors, windows,

exhaust fans and any other gas-burning appliance to

their previous condition.

7.

Any improper operation of common venting system

should be corrected so installation conforms with the

National Fuel Code, ANSI Z223.1/NFPA 54. When re-

sizing any portion of common venting system, common

venting system should be re-sized to approach

minimum size as determined using appropriate tables

in chapter 13 of the National Fuel Code, ANSI Z223.1/

NFPA 54.

Placing The Boiler

• Place boiler to provide most direct connections to

combustion air, vent, and system piping as possible.

• Place crated boiler as close to selected location as

possible and uncrate boiler.

• Move uncrated boiler into position with appliance dolly

or 2-wheel hand truck.

• Insert dolly or hand truck under right hand side of

boiler. It is possible to slide boiler for short distance on

smooth floor or surface.

3 - LOCATING THE BOILER

Advertising