Warning – Dunkirk Q90-200 Series II User Manual

Page 16

Advertising
background image

16

6 - COMBUSTION AIR/ VENT REQUIREMENTS

Figure 12 - Concentric Vent

3” Diameter PVC

Vent/Exhaust

1½”

4½” Dia.

31⅞”

A

A

B

B

C

C

D

E

F

G

G

3” Diameter PVC

Intake/Combustion Air

46¾”

Dimension

1³⁄16”

D

E

F

Dimension

Figure 13 - Concentric Vent Roof Installation

• Combustion air must be clean outdoor air. Do not take

combustion air from inside structure because that air

is frequently contaminated by halogens, which includes

fluorides, chlorides, phosphates, bromides and iodides.

These elements are found in aerosols, detergents,

bleaches, cleaning solvents, salts, air fresheners, paints,

adhesives, and other household products. Typical areas

of contamination include dry cleaning facilities, swimming

pools, beauty shops, new building construction, air

conditioning equipment. For example combustion air

intake near swimming pool chemicals will damage any

condensing boiler.

• Locate combustion air inlet as far away as possible from

swimming pool and swimming pool pump house.

• All combustion air and vent pipes must be airtight and

watertight.

• Follow instructions in this manual for combustion air and

vent piping termination.

• Use of concentric vent termination refer to Figures 10, 11

and 12 for proper setup.

• Vent connections serving appliances vented by natural

draft shall not be connected into any portion of mechanical

draft systems operating under positive pressure.

• Fully support all vent piping. Use hangers at intervals to

prevent pipe from sagging.

WARNING

Fire, explosion, asphyxiation hazard. Solvent

cements are combustible. Keep away from heat,

sparks, or open flame. Use only in well ventilated

areas. Avoid breathing in vapor or allowing contact

with skin or eyes. Improper installation could result

in death or serious injury. Read this manual and

understand all requirements before beginning

installation.

!

A Roof Boot/Flashing

(Field Supplied)

B Elbow (Field Supplied)
C Support (Field Supplied)

D

Maintain 12” (305mm),

18” (457mm)

Minimum Clearance

Above Highest

Anticipated Snow

Level.
Maximum of (610mm)

Above Roof.

WARNING

Fire, asphyxiation hazard. Covering non-metallic

vent pipe and fittings with thermal insulation shall

be prohibited. Improper installation could result in

death or serious injury.

!

NOTICE

Properly support venting. Boiler is not designed to

bear weight of venting system.

Advertising