Emerson Process Management ControlWave EFM 3808 User Manual

Page 120

Advertising
background image

3-4 / Service

CI-ControlWave EFM

Figure 3-1 - Sealed Lead-acid Battery Mounting Diagram

3.2.8 Removal/Replacement of a Power Distribution Board

1. If the ControlWave EFM is running, place any critical control processes under

manual control and shut down the unit by disconnecting power to the System
Controller Module (SCM).

2. Unplug wiring harnesses from Power Distribution Board connectors TB1 through

TB6 (make sure cables are identified for proper replacement).

3. Slide the Power Distribution Board toward the front of the unit and remove it from

its Snap Track Holder.

4. To replace a Power Distribution Board, slide it into its Snap Track Holder. Replace

wiring harness connectors TB1 through TB6.

5. Apply power (replace SCM Power Connector - TB1) and test the unit.

Advertising
This manual is related to the following products: