CHAPTER 5

Rack and Cabinet Requirements

•

Rack Requirements for an EX8208 Switch on page 97

•

Cabinet Requirements and Specifications for an EX8208 Switch on page 100

•

Clearance Requirements for Airflow and Hardware Maintenance for an EX8208
Switch on page 101

Rack Requirements for an EX8208 Switch

You can mount EX8208 switches on four-post racks or two-post racks. See Figure 33 on
page 99
and Figure 34 on page 99.

Rack requirements consist of:

•

Rack type

•

Mounting bracket hole spacing

•

Rack size and strength

•

Rack connection to the building structure

Table 39 on page 98 summarizes rack requirements and specifications for EX8208
switches.

Figure 33 on page 99 shows four-post rack installation. Figure 34 on page 99 shows
two-post rack installation.

NOTE: To manage airflow in a hot-aisle-cold-aisle data center setup, you might want
to use the customized rack solution for EX8200 switches offered by Chatsworth
Products, Inc.