45

Doc. #: 0260011-J0 Rev B

Starting-up the system

11. Switch on the AC mains/utility power.

12. Refer to illustration "AC Wiring" on page 38 and verify the AC input

voltages at the AC wiring terminals:

System

Voltage

Value

ALL

Neutral to Earth Ground

~0V

3 phase

L1 to L2, L2 to L3, L3 to L1

~208V

Neutral to L1 / L2 / L3

~120V

2-pole

L1 to L2

~208V

Neutral to L1 / L2

~120V

Split Phase L1 to L2

~240V

Neutral to L1 / L2

~120V

13. Check that the battery polarity is correct.

14. Turn on the AMPS24 DC Input breakers for each installed shelf.

15. Switch on the external battery breakers or complete the fuse circuit.

16. Verify that the system starts up and that the controller switches on:

the controller display initializes with three LEDs blinking while a self-

test runs for 15 seconds. (Ignore any alarm conditions indicated by

the bottom two LEDs.)

The graphic display shows the correct DC voltage.

Figure 25 — Controller default home screen

Figure 24 — Controller