Standard operations – Hach-Lange DR 2800 eco User Manual

Page 60

Advertising
background image

58

Standard Operations

Enter the name
Please check the working procedure in advance to determine
whether this point really needs to be changed.

1.

Activate the line containing Name and press Edit. Use the
alphanumeric keypad to enter the name indicated in the
working procedure.

2.

Press

OK

to confirm.

Enter the version

1.

Activate the line containing Version and press Edit. Use the
alphanumeric keypad to enter the name indicated in the
working procedure.

2.

Press OK to confirm.

Enter the Measurement Process
Detailed information for entering the measurement process, see

6.1.3 "Free programming" program type on page 75

.

Please check the working procedure in advance to determine
whether this point really needs to be changed.

1.

Activate the Measurement Process line in the data overview
and press Edit.

2.

Press Edit, select the sequence to be edited and press Delete.

3.

Press New and use the alphanumeric keypad to enter the
process indicated in the working procedure.

Timer 1, Timer 2,
Timer 3, Timer 4

This function can be used to enter abbreviations and defined times for up to four timers. Activate
the appropriate line and press Edit.

The timers are activated or deactivated with the control boxes on the left of the display. In the
next column, a selection can be made from a list of names that describe the corresponding work
step. In the third column, the times for each active timer are entered.

Table 7 Definitions of the program points (continued)

Program point

Description

Advertising
This manual is related to the following products: