Calibration check procedure – ZOLL Propaq M Rev A User Manual

Page 14

Advertising
background image

C

HAPTER

1

M

AINTENANCE

T

ESTS

10

9650-0804-01 Rev. A

CO

2

Calibration Check Procedure

Equipment

5% CO

2

calibration gas cylinder with CO

2

sample line (kit available from Scott Medical

Products, PN 4653ORF-BD)

Procedure

1. On the Propaq M, do the following to enter the CO

2

Calibration control panel:

Press the CO

2

quick access key (

).

Use the navigation keys to select Supervisor>Service>Diagnostic>CO

2

>Calibration.

2.

Connect the Propaq M to the 5% CO

2

calibration gas cylinder using the sample line included

with the calibration kit.

3.

From the CO

2

Calibration control panel, select Verify Calibration.

4.

Activate the calibration gas flow by pressing the top valve on the calibration gas canister.

5.

Continue to apply the calibration gas until the status in the CO

2

Calibration control panel

displays: CALIBRATION GAS CAN BE REMOVED.

When the calibration check is complete, the status in the CO

2

Calibration control panel

displays: VERIFICATION DONE - OK OR VERIFICATION DONE - ERROR.

When the calibration check completes successfully, the measured gas value displays in

the CO

2

Calibration control panel.

Acceptable Results

The message displays: VERIFICATION DONE - OK.

The measured gas reading passes if it is between 4.8 and 5.2 (Vol%).

Corrective Action

If an error is reported, refer to Table 1-1 on page 9 for possible causes.

If the measured gas reading is outside the acceptable range, or if calibration is due, complete
the “CO2 Calibration Procedure (required for annual calibration)” on page 9.

CO

2

CO

2

Advertising