Removing the etco, And nibp modules – ZOLL Propaq M Rev A User Manual
Page 55
Removing the EtCO2 and NIBP Modules
9650-0804-01 Rev. A
ZOLL Propaq M Service Manual
51
Removing the EtCO
2
and NIBP Modules
Tool Required
•
# 1 Phillips screwdriver with torque capability
•
orange (wooden) stick
Setup
•
This procedure should be conducted on a static mat.
•
Wear a wrist strap to ground during the procedure.
•
Complete these procedures in the following order before performing this procedure:
1.
“Removing the Handle” on page 43
2.
“Disassembling the Main Unit” on page 44
3.
“Removing the Front Enclosure Module” on page 47
Note:
After replacing the EtCO2 and/or NIBP modules, see Chapter 4, "Resetting Life Cycle
Counters" to reset the life cycle counters for the module(s) that you have replaced.
To assemble the EtCO
2
and/or NIBP modules, reverse the steps.
EtCO
2
and/or NIBP Disassembly
1
Remove the right side panel (containing
temperature, IBP, and USB connectors) by
removing four (4) screws from inside the
unit.
Note: During reassembly, torque screws to
6 in-lbs.
2
Remove three (3) screws from underneath
and outside the unit.
Note: During reassembly, torque screws to
6 in-lbs.