Removing the etco, And nibp modules – ZOLL Propaq M Rev A User Manual

Page 55

Advertising
background image

Removing the EtCO2 and NIBP Modules

9650-0804-01 Rev. A

ZOLL Propaq M Service Manual

51

Removing the EtCO

2

and NIBP Modules

Tool Required

# 1 Phillips screwdriver with torque capability

orange (wooden) stick

Setup

This procedure should be conducted on a static mat.

Wear a wrist strap to ground during the procedure.

Complete these procedures in the following order before performing this procedure:

1.

“Removing the Handle” on page 43

2.

“Disassembling the Main Unit” on page 44

3.

“Removing the Front Enclosure Module” on page 47

Note:

After replacing the EtCO2 and/or NIBP modules, see Chapter 4, "Resetting Life Cycle
Counters" to reset the life cycle counters for the module(s) that you have replaced.

To assemble the EtCO

2

and/or NIBP modules, reverse the steps.

EtCO

2

and/or NIBP Disassembly

1

Remove the right side panel (containing
temperature, IBP, and USB connectors) by
removing four (4) screws from inside the
unit.

Note: During reassembly, torque screws to
6 in-lbs.

2

Remove three (3) screws from underneath
and outside the unit.

Note: During reassembly, torque screws to
6 in-lbs.

Advertising