6 connecting the signal lines – Yokogawa DA100 User Manual

Page 43

Advertising
background image

IM DA100-01E

2-22

Wiring Diagrams
• Single-phase Two-wire Configuration

LOAD

V

±

V

A

±

A

SOURCE

SOURCE

LOAD

FUSE

FUSE

A1

V1

• Single-phase Three-wire Configuration (power monitor modules for three-phase

use only)

SOURCE

LOAD

V

A

±

±

A

V

V

±

V

A

±

A

1

3

1

3

N

SOURCE

LOAD

N

FUSE

FUSE

FUSE

A1

V1

A3

V3

FUSE

• Three-phase Three-wire Configuration (dual-current/dual-voltage measurement;

power monitor modules for three-phase use only)

SOURCE

LOAD

A

±

A

±

A

A

1

3

V

±

V

V

V

3

1

R

S

T

±

SOURCE

LOAD

S

T

R

FUSE

FUSE

FUSE

A1

V1

A3

V3

FUSE

• Three-phase Three-wire Configuration (triple-current/triple-voltage

measurement; power monitor modules for three-phase use only)

SOURCE

LOAD

A

±

A

A

±

A

1

3

R

S

T

V

±

V

1

±

V

V

3

±

V

V

2

A

±

A

2

SOURCE

LOAD

S

T

R

FUSE

FUSE

FUSE

A1

V1

A2

V2

FUSE

FUSE

A3

V3

FUSE

• Three-phase Four-wire Configuration (power monitor modules for three-phase

use only)

SOURCE

LOAD

A

±

A

A

±

A

1

3

R

S

T

V

±

V

1

±

V

V

3

±

V

V

2

A

±

A

2

N

LOAD

SOURCE

S

R

T

N

A1

V1

A2

V2

A3

V3

FUSE

FUSE

FUSE

FUSE

FUSE

FUSE

2.6 Connecting the Signal Lines

Advertising